Dear Mr.Eugen,
Thanks for your comments. My intention is to easily remove the Geolink from the heli when needed. below is my assembly plan
Attachment:
Assy.jpg [ 36.68 KiB | Viewed 569 times ]
Geolink will be mounted using 3M pad on the part B. Then the part B will mount on the part A with plastic bolt + nuts. When requires, just unscrew the 4 screws and remove the Geolink assy. Since the Geolink mount plate (part B) is flat, it can be place on a level place when calibration.
When Geolink is mounted with 3M pad on any surface, it will become almost permanent. If it mount on the part A, it will be not easy to separate it from the bracket and the whole mounting assy needs to take out from the heli.
I am planning to use the design on my Trex 700E heli. Just trying on 450L first.
Regards,
Amal